The group company donated to fully support the people in the region to fight drought and disaster relief
Author:admin Released in:2010-03-11 16:50:24
Abstract:The production line actually only took less than 5 months from the preparation at the beginning of the year to the commissioning and commissioning.
The production line actually only took less than 5 months from the preparation at the beginning of the year to the commissioning and commissioning. It adopted the most advanced production equipment and technology of oxidation, coloring, and electrophoresis, and used a fully computerized automatic control system to make the line in the single-line capacity, Profiles have distinct characteristics and industry advantages in terms of color matching and automatic control. The second vertical oxidation line that has just been put into production is an oxidation, coloring, and electrophoresis production line, with a single line capacity of up to 3,500 tons per month. The smooth commissioning of this line is expected to increase our company’s oxidation capacity by 30%. It has a positive effect on ensuring product quality, increasing the yield, and ensuring on-time delivery. At the same time, it can better meet the individualization of oxidation electrophoresis profiles in various markets. Demand, fundamentally enhance the market competitiveness of our products.